Skip to main content
IEC 61850 User Group
Login | Join | Help (new window)


IEC 61850 User Group > IEC 61850 IOP Charlotte 2019
Site for the IEC 61850 2019 IOP in Charlotte

Current Registered Companies

Participating Companies

Witnessing Companies

ABB

American Electric Power

Arc Informatique

Central Research Institute of Electric Power

CISCO

Commonwealth Edison

Copadata

DNV GL Netherlands B.V.

Doble Engineering

EDF

GE

Electric Power Research Institute

Gridclone

Electrics Testing Center, Taiwan

Helinks

Hydro-Quebec

Kalkitech / ASE

It4Power

KEPCO

KEPCO

KERI (Korea Electrotechnology Research Institute)

Korea Electrotechnology Research Institute

Novatech

National Grid

NR Electric

Pacific Northwest National Lab

OMICRON Electronics GmbH

Power Grid Corporation of India

PCItek

RTE

JPEmbedded SP. J.

Southern California Edison

RTDS Technologies Inc.

Taiwan Power

Schweitzer Engineering Laboratories, Inc.

Zamiren

Siemens

 

Beijing Sifang Automation Company

 

SISCO, Inc

 

Toshiba Energy Systems & Solutions Corp

 

Triangle Microworks

 

Vizimax, Inc

 

 

 

Confirmed Shipping and Recieving Address for Charlotte IOP:

Electric Power Research Institute (EPRI)

Attn: Paul Myrda/Linda Dabbs

1300 W. W.T. Harris Blvd

Charlotte, NC 28262

All Labels MUST include the following information:

1.       Meeting Dates: September 20, 2019 – September 27, 2019

2.       Meeting Name: IEC 61850 IOP

3.       Meeting Location: Building 3 Room 741

 

When you are ready to ship please provide me with all the shipping tracking numbers.  EPRI does have a forklift and flatbed truck to bring equipment from building 1 to building 3. There is NO receiving dock in building 3.   Send tracking information to: ldabbs@epri.com (Linda Dabbs)

Please note:  This address should also be used for taxi and Uber drop offs for the IOP.

For September 20th setup, room will be available at 1:00 PM.

Boot Camp will be located in Building 2.

SCL Validation Tools

Rules for Use

As the purpose of the IOP is to capture, report, and correct issues: 

Please report a summary of issues found with the SCL files, or tools,  to herb.falk@otb-consultingservices.com.

 Please start the subject with [SCL Validation Error Report]. 

Any problems found with the tools, should also be copied to the vendor of that tool.

Online SCL Validation Tools:

EDF/Hydo-Quebec (contact aurelie.dehouck-neveu@edf.fr):

https://rise-clipse.pam-retd.fr/

Triangle Microworks (contact jgreene@trianglemicroworks.com ):

 http://www.trianglemicroworks.com/products/testing-and-configuration-tools/scl-navigator-pages/overview

 

Offline Tools:

Bruce Muschlitz Open Tools (contact b.muschlitz@ieee.org ):

http://www.ucaiug.org/org/TechnicalO/Testing/Shared%20Documents/Tools

Content Editor Web Part

Due Dates

Due Dates for Payment: * Mid-July for Participants * Mid-August for Witnesses

2019 IEC 61850 IOP Charlotte Registration

2019 IEC61850 IOP Participation Options

Participant

UCAIug Corporate Member

Non- UCAIug Corporate Member1

Payment Method

Credit Card

Bill Us

Credit Card

Bill Us

One Person

Included

Two People Included2

Witnesses and Additional Attendees

UCA Individual or Corporate Members

Non-Individual Member3

Payment Method

Credit Card

Bill

Us

Credit Card

Bill Us

Per Person

Boot Camp

Payment Method

Credit Card

Bill Us

Per Non-student

Per Student

Note: Student Participation limited to 10.

UCAIug 2019 IOP PICTURES

Survey Name: UCAIug 2019 IOP PICTURES
Survey Description: Please indicate below your agreement to have your picture taken and used/posted.
Time Created: 2/27/2019 12:15 PM
Number of Responses: 12

IOP Discussions

There are no items to show in this view of the "IOP Discussions" discussion board.
 
 

IOP Calendar

There are currently no upcoming events.

Task List

Shipping and Receiving Address:
Microsoft Windows SharePoint Services Logo